Project Description

Banking

Renowned Bank on 100 Cannon Street

INTRODUCTION

Installing additional small power to suit new furniture layout.

AMD Environmental completed a #project for a renowned bank, 🏦 in conjunction with ISG at 100 Cannon Street London – UK to complete their Electrical works.

BENEFITS

Seamless integration: New circuits and sockets perfectly matched proposed desk arrangements.
Flexibility: Modular power infrastructure supports evolving workspace needs.
Capacity: Added power provides the ability to add more equipment per workstation.
Productivity: Optimized workspaces encourage collaboration and efficiency.
Future-proofing: The system accommodates continued changes in office configurations.
Enhanced experience: Employees benefit from an inviting, ergonomic office environment.
Cost efficiency: Proactive planning prevents overbuilding infrastructure.

AT A GLANCE

SERVICES

Electrical

PROJECT DETAILS

Client: ISG

Contract Length: 1 week

Location: 100 Cannon Street London

T E A M

Our project management team
consisted of electrical
Project Managers and site
managers, working alongside ISG
site management team and
technical team.

Progress reports and weekly site
meetings were used to co-ordinate
work with the client and ourselves.

Objectives

ISG appointed AMD Environmental to instal additional small power to suit new furniture layout for a renowned bank at 100 Cannon Street.

Methodology

Programs (including a detailed commissioning program) were issued to the client for approval before the works began.

All method statements were checked by our health and safety manager and issued to the client 2 weeks in advance of any works carried out. All operatives were then required to read, sign and keep a copy of their relevant work activity RAMS. These were then reviewed periodically to ensure they were current and reflective of the works and site.

Banking
Banking

Methodology 

We also issued in advance our trade quality plan which sets out how we intend to manage and control the quality of the installation and materials used. This was then added to by our quality snagging and inspection reports to ensure any issues were identified and closed out.

Our quantity surveyor and commercial department worked alongside ISG’s and the project QS to ensure cost management and change control were communicated, reported and managed to ensure accurate cost reporting and negating program implications.

Works

  • Mapping out optimal new socket locations to align with the modular desk system.
  • Installing new ring mains to provide capacity for additional circuits.
  • Extending power distribution boards to incorporate new protective devices.
  • Running new conduit and cabling networks from boards to workstation areas.
  • Fitting high-capacity sockets at each desk location per the design.
  • Labelling and testing all new installations for safety and performance.
  • Providing technical documentation and guides for ongoing operations.